Thanks Sniffer, top man!
You have given me some bits to consider with the sealant and beading, I will do this!!
Im going with the 19mm floor, im guessing you went with a thicker one?
Did you double glaze??
I like the idea of laying a laminate over the floor running the other way to T&G so I will do that before putting my matts down, good idea!
Im going to get my sparks to run a conduit system in the cabin to hide the cables, I run an electrical wholesalers so this will be pretty inexpensive!
I'm going to wall mount a 2kw convector and run it off a socket, like you said I don't think I will need it much but at least its there.
What are your eaves and ridge heights?
The Power rack I am getting is 2160mm high and does have pull up bars attached, it will be going against the back wall opposite the door but I would like to slide over to the left as far as possible but the roof declines from the centre to the left and right and I was wondering how far Left I can mover it before the 2160mm hits the declining roof, would you have any idea?
Im getting a chippie to build mine with my help, hes built a similar one before but on a larger scale that was used for a pool house, with me now getting him to lay the laminate floor as well I still think two days will be ample!
Im sure I will have more questions mate, thank you for taking the time to assist so far, I will keep you posted!! |
|